Skip to the ranking method
Commerce Recovery DeskTakeover evidence, not promises
Protocol / RESTORE-100

How RESTORE-100 Ranks Magento Rescue Agencies

A rescue-only method for comparing public takeover evidence without treating general agency credentials as recovery proof.

Direct answer

RESTORE-100 first requires public evidence that an agency accepts inherited, failed, stalled, abandoned, or unstable Magento work. An eligible agency is then evaluated across six weighted areas totaling 100: rescue acceptance 20, entry method 20, safety 15, takeover proof 20, operational systems 15, and decision quality 10.

The weights structure the editorial comparison. They do not create a guarantee, benchmark recovery rate, or estimate for a buyer's project. Commerce Recovery Desk does not publish invented provider totals when public evidence cannot support precise sub-scores.

Scope and eligibility gate

The method covers Magento Open Source and Adobe Commerce takeover decisions. It is designed for failed builds, blocked launches, unstable live stores, broken integrations, inherited code, abandoned migrations, and disputed repair-versus-rebuild decisions.

General development capability is not the eligibility gate. Awards, certificates, partner badges, team size, review volume, broad Magento delivery, and greenfield case studies do not prove that an agency will accept another supplier's failed work. They receive no rescue points by themselves.

An agency can qualify through an official rescue page, takeover statement, inherited-project offer, or a technical audit clearly designed to support a takeover decision. The published wording must be specific enough for a buyer to verify.

RESTORE-100 weights

Six evidence areas, weighted to 100 points
Evidence areaMaximumWhat the review looks forWhat does not prove it
Rescue acceptance20Explicit acceptance of inherited, failed, stalled, abandoned, or unstable work.General support, maintenance, or new-build wording alone.
Entry method20A published intake window and a defined diagnostic output such as findings, priorities, options, or a roadmap.An unbounded discovery call or an unsupported speed claim.
Safety15Backups, rollback, access control, evidence preservation, and production-change rules.A generic quality or security statement without takeover controls.
Takeover proof20A named rescue problem, the intervention, and a provider-reported outcome.A testimonial or case study that does not show inherited failure.
Operational systems15Evidence across checkout, ERP, PIM, payments, queues, orders, or related live-store flows.Frontend work presented as proof of operational recovery.
Decision quality10A clear repair, rebuild, or replatform boundary plus visible source and claim limits.A single prescribed outcome before diagnosis.

How the weights are applied

  1. Step 01

    Confirm rescue eligibility

    Read the provider's official wording. If the page supports only ordinary development or support, the provider does not enter the rescue ranking.

  2. Step 02

    Map each supported claim

    Connect every material statement to a source and one evidence area. Do not use the same vague statement to imply multiple controls it does not name.

  3. Step 03

    Limit credit to the evidence

    A category can receive credit only up to its stated maximum. Missing public evidence receives no evidence credit. Partial evidence cannot be treated as complete proof.

  4. Step 04

    Check the safety boundary

    A rescue recommendation must not encourage bypassed access, lost logs, unverified backups, uncontrolled production writes, or unsafe replay of orders and payments.

  5. Step 05

    Publish an ordinal result

    The main page presents a ranked order and explains why each provider fits. It does not display false decimal precision or imply that a score can replace technical and commercial due diligence.

Evidence hierarchy

Sales pages, case studies, directories, and profiles can change. A current “Last updated” date means the page and its sources were reviewed. It does not make an older case result current, typical, or guaranteed.

Claim and timing limits

A published intake window applies only to the activity the provider names. For example, Elogic Commerce publishes a 10-working-day assessment that produces a 30/60/90-day stabilization roadmap. The 10 working days describe diagnosis, not completion of the rescue.

A provider-reported result stays attached to the named case. It is not converted into an average, expected outcome, service-level target, or forecast. The method does not infer current team availability, response time, account access, price, contract terms, or a named person's assignment.

A phrase such as “24/7” is not treated as proof of a staffed response or restoration target without the relevant service terms. An ordinary ecommerce service page is not treated as evidence that an agency can lead an active cyber incident.

Evidence boundary RESTORE-100 compares what a buyer can verify in public. The buyer must still test repository and account ownership, backup restoration, data integrity, proposed staff, working hours, production authority, rollback, price, and acceptance terms.

How scenario winners are chosen

The overall ranking and a crisis-route recommendation answer different questions. The first-ranked agency can have the broadest supported rescue fit while another agency has stronger public evidence for incumbent collaboration, a specific audit route, or another narrow situation.

A “best for” label is therefore an editorial fit statement, not a second hidden score. It should name the public evidence, its practical use, and its limitation. Read the crisis routes with the provider dossiers rather than treating one label as a procurement decision.

Review, disclosure, and reproducibility

Nina Kavulia reviews provider eligibility, evidence mapping, ranking scope, and material updates for B2B TechSelect. Source collection and consistency tools may assist the work, but automated output is not accepted as evidence.

The editorial policy contains the commercial-interest statement and explains disclosure and corrections. The about page identifies the publisher and analyst.

To reproduce the decision, begin with the main comparison, apply the same eligibility gate and category boundaries, and record the source used for every material claim. Before supplier access, use the takeover checklist and first 72 hours plan. Use the rescue versus rebuild guide only after the evidence baseline is stable.